Date and DateTime

The Dates module provides two types for working with dates: Date and DateTime, representing day and millisecond precision, respectively; both are subtypes of the abstract TimeType. The motivation for distinct types is simple: some operations are much simpler, both in terms of code and mental reasoning, when the complexities of greater precision don’t have to be dealt with. For example, since the Date type only resolves to the precision of a single date (i.e. no hours, minutes, or seconds), normal considerations for time zones, daylight savings/summer time, and leap seconds are unnecessary and avoided.

Both Date and DateTime are basically immutable Int64 wrappers. The single instant field of either type is actually a UTInstant{P} type, which represents a continuously increasing machine timeline based on the UT second [1]. The DateTime type is timezone-unaware (in Python parlance) or is analogous to a LocalDateTime in Java 8. Additional time zone functionality can be added through the TimeZones.jl package, which compiles the Olsen Time Zone Database. Both Date and DateTime are based on the ISO 8601 standard, which follows the proleptic Gregorian calendar. One note is that the ISO 8601 standard is particular about BC/BCE dates. In general, the last day of the BC/BCE era, 1-12-31 BC/BCE, was followed by 1-1-1 AD/CE, thus no year zero exists. The ISO standard, however, states that 1 BC/BCE is year zero, so 0000-12-31 is the day before 0001-01-01, and year -0001 (yes, negative one for the year) is 2 BC/BCE, year -0002 is 3 BC/BCE, etc.

[1]The notion of the UT second is actually quite fundamental. There are basically two different notions of time generally accepted, one based on the physical rotation of the earth (one full rotation = 1 day), the other based on the SI second (a fixed, constant value). These are radically different! Think about it, a “UT second”, as defined relative to the rotation of the earth, may have a different absolute length depending on the day! Anyway, the fact that Date and DateTime are based on UT seconds is a simplifying, yet honest assumption so that things like leap seconds and all their complexity can be avoided. This basis of time is formally called UT or UT1. Basing types on the UT second basically means that every minute has 60 seconds and every day has 24 hours and leads to more natural calculations when working with calendar dates.

Constructors

Date and DateTime types can be constructed by integer or Period types, by parsing, or through adjusters (more on those later):

julia>DateTime(2013)2013-01-01T00:00:00julia>DateTime(2013,7)2013-07-01T00:00:00julia>DateTime(2013,7,1)2013-07-01T00:00:00julia>DateTime(2013,7,1,12)2013-07-01T12:00:00julia>DateTime(2013,7,1,12,30)2013-07-01T12:30:00julia>DateTime(2013,7,1,12,30,59)2013-07-01T12:30:59julia>DateTime(2013,7,1,12,30,59,1)2013-07-01T12:30:59.001julia>Date(2013)2013-01-01julia>Date(2013,7)2013-07-01julia>Date(2013,7,1)2013-07-01julia>Date(Dates.Year(2013),Dates.Month(7),Dates.Day(1))2013-07-01julia>Date(Dates.Month(7),Dates.Year(2013))2013-07-01

Date or DateTime parsing is accomplished by the use of format strings. Format strings work by the notion of defining delimited or fixed-width “slots” that contain a period to parse and passing the text to parse and format string to a Date or DateTime constructor, of the form Date("2015-01-01","y-m-d") or DateTime("20150101","yyyymmdd").

Delimited slots are marked by specifying the delimiter the parser should expect between two subsequent periods; so "y-m-d" lets the parser know that between the first and second slots in a date string like "2014-07-16", it should find the - character. The y, m, and d characters let the parser know which periods to parse in each slot.

Fixed-width slots are specified by repeating the period character the number of times corresponding to the width with no delimiter between characters. So "yyyymmdd" would correspond to a date string like "20140716". The parser distinguishes a fixed-width slot by the absence of a delimiter, noting the transition "yyyymm" from one period character to the next.

Support for text-form month parsing is also supported through the u and U characters, for abbreviated and full-length month names, respectively. By default, only English month names are supported, so u corresponds to “Jan”, “Feb”, “Mar”, etc. And U corresponds to “January”, “February”, “March”, etc. Similar to other name=>value mapping functions dayname() and monthname(), custom locales can be loaded by passing in the locale=>Dict{UTF8String,Int} mapping to the MONTHTOVALUEABBR and MONTHTOVALUE dicts for abbreviated and full-name month names, respectively.

One note on parsing performance: using the Date(date_string,format_string) function is fine if only called a few times. If there are many similarly formatted date strings to parse however, it is much more efficient to first create a Dates.DateFormat, and pass it instead of a raw format string.

julia>df=Dates.DateFormat("y-m-d");julia>dt=Date("2015-01-01",df)2015-01-01julia>dt2=Date("2015-01-02",df)2015-01-02

A full suite of parsing and formatting tests and examples is available in tests/dates/io.jl.

Durations/Comparisons

Finding the length of time between two Date or DateTime is straightforward given their underlying representation as UTInstant{Day} and UTInstant{Millisecond}, respectively. The difference between Date is returned in the number of Day, and DateTime in the number of Millisecond. Similarly, comparing TimeType is a simple matter of comparing the underlying machine instants (which in turn compares the internal Int64 values).

julia>dt=Date(2012,2,29)2012-02-29julia>dt2=Date(2000,2,1)2000-02-01julia>dump(dt)Dateinstant:UTInstant{Day}periods:Dayvalue:Int64734562julia>dump(dt2)Dateinstant:UTInstant{Day}periods:Dayvalue:Int64730151julia>dt>dt2truejulia>dt!=dt2truejulia>dt+dt2OperationnotdefinedforTimeTypesjulia>dt*dt2OperationnotdefinedforTimeTypesjulia>dt/dt2OperationnotdefinedforTimeTypesjulia>dt-dt24411daysjulia>dt2-dt-4411daysjulia>dt=DateTime(2012,2,29)2012-02-29T00:00:00julia>dt2=DateTime(2000,2,1)2000-02-01T00:00:00julia>dt-dt2381110402000milliseconds

Accessor Functions

Because the Date and DateTime types are stored as single Int64 values, date parts or fields can be retrieved through accessor functions. The lowercase accessors return the field as an integer:

julia>t=Date(2014,1,31)2014-01-31julia>Dates.year(t)2014julia>Dates.month(t)1julia>Dates.week(t)5julia>Dates.day(t)31

While propercase return the same value in the corresponding Period type:

julia>Dates.Year(t)2014yearsjulia>Dates.Day(t)31days

Compound methods are provided, as they provide a measure of efficiency if multiple fields are needed at the same time:

julia>Dates.yearmonth(t)(2014,1)julia>Dates.monthday(t)(1,31)julia>Dates.yearmonthday(t)(2014,1,31)

One may also access the underlying UTInstant or integer value:

julia>dump(t)Dateinstant:UTInstant{Day}periods:Dayvalue:Int64735264julia>t.instantUTInstant{Day}(735264days)julia>Dates.value(t)735264

Query Functions

Query functions provide calendrical information about a TimeType. They include information about the day of the week:

julia>t=Date(2014,1,31)2014-01-31julia>Dates.dayofweek(t)5julia>Dates.dayname(t)"Friday"julia>Dates.dayofweekofmonth(t)5# 5th Friday of January

Month of the year:

julia>Dates.monthname(t)"January"julia>Dates.daysinmonth(t)31

As well as information about the TimeType‘s year and quarter:

julia>Dates.isleapyear(t)falsejulia>Dates.dayofyear(t)31julia>Dates.quarterofyear(t)1julia>Dates.dayofquarter(t)31

The dayname() and monthname() methods can also take an optional locale keyword that can be used to return the name of the day or month of the year for other languages/locales:

julia>constfrench_daysofweek=Dict(1=>"Lundi",2=>"Mardi",3=>"Mercredi",4=>"Jeudi",5=>"Vendredi",6=>"Samedi",7=>"Dimanche");# Load the mapping into the Dates module under locale name "french"julia>Dates.VALUETODAYOFWEEK["french"]=french_daysofweek;julia>Dates.dayname(t;locale="french")"Vendredi"

Similarly for the monthname() function, a mapping of locale=>Dict{Int,UTF8String} should be loaded in VALUETOMONTH.

TimeType-Period Arithmetic

It’s good practice when using any language/date framework to be familiar with how date-period arithmetic is handled as there are some tricky issues to deal with (though much less so for day-precision types).

The Dates module approach tries to follow the simple principle of trying to change as little as possible when doing Period arithmetic. This approach is also often known as calendrical arithmetic or what you would probably guess if someone were to ask you the same calculation in a conversation. Why all the fuss about this? Let’s take a classic example: add 1 month to January 31st, 2014. What’s the answer? Javascript will say March 3 (assumes 31 days). PHP says March 2 (assumes 30 days). The fact is, there is no right answer. In the Dates module, it gives the result of February 28th. How does it figure that out? I like to think of the classic 7-7-7 gambling game in casinos.

Now just imagine that instead of 7-7-7, the slots are Year-Month-Day, or in our example, 2014-01-31. When you ask to add 1 month to this date, the month slot is incremented, so now we have 2014-02-31. Then the day number is checked if it is greater than the last valid day of the new month; if it is (as in the case above), the day number is adjusted down to the last valid day (28). What are the ramifications with this approach? Go ahead and add another month to our date, 2014-02-28+Month(1)==2014-03-28. What? Were you expecting the last day of March? Nope, sorry, remember the 7-7-7 slots. As few slots as possible are going to change, so we first increment the month slot by 1, 2014-03-28, and boom, we’re done because that’s a valid date. On the other hand, if we were to add 2 months to our original date, 2014-01-31, then we end up with 2014-03-31, as expected. The other ramification of this approach is a loss in associativity when a specific ordering is forced (i.e. adding things in different orders results in different outcomes). For example:

julia>(Date(2014,1,29)+Dates.Day(1))+Dates.Month(1)2014-02-28julia>(Date(2014,1,29)+Dates.Month(1))+Dates.Day(1)2014-03-01

What’s going on there? In the first line, we’re adding 1 day to January 29th, which results in 2014-01-30; then we add 1 month, so we get 2014-02-30, which then adjusts down to 2014-02-28. In the second example, we add 1 month first, where we get 2014-02-29, which adjusts down to 2014-02-28, and then add 1 day, which results in 2014-03-01. One design principle that helps in this case is that, in the presence of multiple Periods, the operations will be ordered by the Periods’ types, not their value or positional order; this means Year will always be added first, then Month, then Week, etc. Hence the following does result in associativity and Just Works:

julia>Date(2014,1,29)+Dates.Day(1)+Dates.Month(1)2014-03-01julia>Date(2014,1,29)+Dates.Month(1)+Dates.Day(1)2014-03-01

Tricky? Perhaps. What is an innocent Dates user to do? The bottom line is to be aware that explicitly forcing a certain associativity, when dealing with months, may lead to some unexpected results, but otherwise, everything should work as expected. Thankfully, that’s pretty much the extent of the odd cases in date-period arithmetic when dealing with time in UT (avoiding the “joys” of dealing with daylight savings, leap seconds, etc.).

Adjuster Functions

As convenient as date-period arithmetics are, often the kinds of calculations needed on dates take on a calendrical or temporal nature rather than a fixed number of periods. Holidays are a perfect example; most follow rules such as “Memorial Day = Last Monday of May”, or “Thanksgiving = 4th Thursday of November”. These kinds of temporal expressions deal with rules relative to the calendar, like first or last of the month, next Tuesday, or the first and third Wednesdays, etc.

The Dates module provides the adjuster API through several convenient methods that aid in simply and succinctly expressing temporal rules. The first group of adjuster methods deal with the first and last of weeks, months, quarters, and years. They each take a single TimeType as input and return or adjust to the first or last of the desired period relative to the input.

# Adjusts the input to the Monday of the input's weekjulia>Dates.firstdayofweek(Date(2014,7,16))2014-07-14# Adjusts to the last day of the input's monthjulia>Dates.lastdayofmonth(Date(2014,7,16))2014-07-31# Adjusts to the last day of the input's quarterjulia>Dates.lastdayofquarter(Date(2014,7,16))2014-09-30

The next two higher-order methods, tonext(), and toprev(), generalize working with temporal expressions by taking a DateFunction as first argument, along with a starting TimeType. A DateFunction is just a function, usually anonymous, that takes a single TimeType as input and returns a Bool, true indicating a satisfied adjustment criterion. For example:

julia>istuesday=x->Dates.dayofweek(x)==Dates.Tuesday# Returns true if the day of the week of x is Tuesday(anonymousfunction)julia>Dates.tonext(istuesday,Date(2014,7,13))# 2014-07-13 is a Sunday2014-07-15# Convenience method provided for day of the week adjustmentsjulia>Dates.tonext(Date(2014,7,13),Dates.Tuesday)2014-07-15

This is useful with the do-block syntax for more complex temporal expressions:

julia>Dates.tonext(Date(2014,7,13))dox# Return true on the 4th Thursday of November (Thanksgiving)Dates.dayofweek(x)==Dates.Thursday&&Dates.dayofweekofmonth(x)==4&&Dates.month(x)==Dates.Novemberend2014-11-27

The final method in the adjuster API is the recur() function. recur() vectorizes the adjustment process by taking a start and stop date (optionally specificed by a StepRange), along with a DateFunction to specify all valid dates/moments to be returned in the specified range. In this case, the DateFunction is often referred to as the “inclusion” function because it specifies (by returning true) which dates/moments should be included in the returned vector of dates.

# Pittsburgh street cleaning; Every 2nd Tuesday from April to November# Date range from January 1st, 2014 to January 1st, 2015julia>dr=Dates.Date(2014):Dates.Date(2015);julia>recur(dr)doxDates.dayofweek(x)==Dates.Tue&&Dates.April<=Dates.month(x)<=Dates.Nov&&Dates.dayofweekofmonth(x)==2end8-elementArray{Date,1}:2014-04-082014-05-132014-06-102014-07-082014-08-122014-09-092014-10-142014-11-11

Additional examples and tests are available in test/dates/adjusters.jl.

Period Types

Periods are a human view of discrete, sometimes irregular durations of time. Consider 1 month; it could represent, in days, a value of 28, 29, 30, or 31 depending on the year and month context. Or a year could represent 365 or 366 days in the case of a leap year. Period types are simple Int64 wrappers and are constructed by wrapping any Int64 convertible type, i.e. Year(1) or Month(3.0). Arithmetic between Period of the same type behave like integers, and limited Period-Real arithmetic is available.

julia>y1=Dates.Year(1)1yearjulia>y2=Dates.Year(2)2yearsjulia>y3=Dates.Year(10)10yearsjulia>y1+y23yearsjulia>div(y3,y2)5yearsjulia>y3-y28yearsjulia>y3*y220yearsjulia>y3%y20yearsjulia>y1+2021yearsjulia>div(y3,3)# mirrors integer division3years

See the API reference for additional information on methods exported from the Dates module.